SYNDIWISE · MAROC / MOROCCO

Construction cost in Morocco: area, quotes and budget.

Enter floor area and construction type. Works, an allowance for additional costs and contingency are estimated automatically.

References checked on 11 October 2026 · Indicative estimate
  1. Add built floor areas without counting the basement twice.
  2. Replace benchmarks with two quotes covering the same works.
  3. Check VAT, land, taxes and missing items.
01 · Floor areas

Use gross built areas from the plans, including walls and circulation. This is neither plot size nor just usable living space. For unequal floors, add their areas and choose total built area. Open terraces and external works belong in additional works.

02 · Construction works

Francobat’s published 2026 ranges are commercial benchmarks, not a national tariff. Exact inclusions and VAT are unspecified: confirm scope and prices with local contractors. Luxury projects can exceed these figures.

For a single quote, enter the same lower and upper rate. Include normal foundations, structure, roof, services and finishes in the per-m² price. A structural-shell-only quote produces a shell-only estimate. Do not add an item again if already included.

Default 0: no extras included. Boundary walls, access, pool, garden, lift, special foundations, demolition… Separate quotes outside the per-m² price.
Editable planning assumption. Applied to works and extras, excluding fees, taxes, land and financing. It is not a cap on overruns.
03 · Additional project costs

The calculator allows 8–12% of works for the architect, studies, formalities, connections and insurance. This is a planning assumption selected for this tool, not an official tariff or verified market average. It targets ordinary costs for a residential project on a serviced plot; remote networks or complex sites may require more. CSS, land, financing and special works remain separate.

Adjust the automatic allowance
Applied to costed works, basement and extras; excludes contingency, land and financing. Budgeted payable amount: VAT is not added again.
04 · Land and financing

Method and sources

The works budget multiplies built area by a price range, then adds entered costs and contingency. No automatic city or floor coefficients are invented. Two comparable local quotes and a soil study help refine the project. This is neither a binding quote nor a guaranteed statistical range.

Francobat · 2026 construction benchmarks Majid Lahbabi · project and budget examples Archiplan · services and fees DGI · 2026 MRE guide, CSS Rokhas · permits

Land area or built area?

For 100 gross m² on the ground floor and 100 m² upstairs, enter 200 total m² or 100 m² × 2 levels. The ground floor counts as a level. An open terrace and a separately priced basement must not be added to this area.

How is CSS calculated?

For eligible personal housing, the rate applies to the entire unit’s covered area: up to 300 m² exempt; above 300 up to 400 m² MAD 60/m²; up to 500 m² MAD 100/m²; above that MAD 150/m². Example: 350 m² × 60 = MAD 21,000, not 50 m² × 60. Confirm taxable area, especially basements and multiple units.

Compare two construction quotes →

Ranges do not guarantee a final price. Unspecified costs stay outside totals, with a list of items to complete.